Skip to content
View in the app

A better way to browse. Learn more.

Pattaya Addicts Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Walking Street electrical cable work construction delayed, proposal changed

Featured Replies

Pattaya- A plan to move overhead electrical cables underground on Walking Street which would take months and cause substantial digging and construction work was delayed due to a new proposal. The Pattaya News originally spoke about this proposal earlier this summer during the Covid-19 lockdown period. Small portions of work have already been completed near […]

Walking Street electrical cable work construction delayed, proposal changed
-=-=-=-=--=-=-=-=-=-=-=-=-==-=-
The Pattaya News - Real. Unbiased. Impactful. In the moment.

Click To View The Pattaya News Website

Sign up to our newsletter here

https://thepattayanews.com/newsletter/

Check out our Youtube Channel

https://www.youtube.com/channel/UCznGH-m-TAn2iqTYQL5yOcA

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.