Jump to content

Support our Sponsors >> Thai Friendly | Pattaya News | Pattaya Unplugged | Buy a drink for Soi 6 Girls | Thailand 24/7 Forum | TPN Property | La La Land bar | NEW PA website | Subscribe to The Pattaya News |Pattaya Investigations | Rage Fight Academy | Buy/Sell Businesses | Isaan Lawyers | Siam Business Brokers | Belts Of Mongering - Mongering Authority | Add your Text or Event here

IGNORED

New motorway from Pattaya to Rayong on schedule and set to open in May


The Pattaya News

Recommended Posts

Pattaya- A new section of motorway from Pattaya to Maptaphut in Rayong that has been under construction for some time is nearly ready to officially open, the Thai Highway Department has told the local media this week. The new section is set to be open to the public in May and as part of the […]

The post New motorway from Pattaya to Rayong on schedule and set to open in May appeared first on The Pattaya News.

Click To View The Pattaya News Website

Sign up to our newsletter here

https://thepattayanews.com/newsletter/

Check out our Youtube Channel

https://www.youtube.com/channel/UCznGH-m-TAn2iqTYQL5yOcA

Link to comment
Share on other sites

  • 3 months later...

New motorway opens 22 May.

Motorists can zip down new Pattaya-Map Ta Phut motorway for free until Aug 31

The Highways Department will open the extended section of Motorway No 7 (Pattaya-Map Ta Phut) on May 22 and allow motorists to use the section for free until the end of August, director-general Sarawut Songsiwilai said on Sunday.

“Motorway No 7 connects Bangkok to Banchang district in Rayong and is part of the department’s 20-year strategic plan to develop the interprovincial motorway network,” he said. “It currently ends at Pattaya. The extended section will now run from Pattaya to Map Ta Phut in Rayong.”

Sarawut explained that the 32-kilometre extended section comprises three toll booths – at Huai Yai, Khao She On and Map Ta Phut districts.“

The cost of the project was Bt17.78 billion, comprising Bt6 billion for land expropriation and Bt11.78 billion for construction. The extended section was 100 per cent financed by profit from toll fee collections on Highway 7 and Highway 9,” he said.“

From May 22, the public can use the section for free starting at the U-Tapao toll booth. After August 31, the toll fee for Motorway No 7 will be Bt25-130 for four-wheel vehicles, Bt45-210 for six-wheel vehicles and Bt60-305 for other vehicles.”

“The Bangkok-Banchang Motorway No 7 is an important route that completes the transportation network in the Eastern Economic Corridor and will connect existing and future marine and air transportation routes,” he added. “It will also promote inter-border trade with neighbouring countries, reduce traffic congestion on main highways and drive the local economy.”

Link to comment
Share on other sites

15 minutes ago, forcebwithu said:

New motorway opens 22 May.

Motorists can zip down new Pattaya-Map Ta Phut motorway for free until Aug 31

The Highways Department will open the extended section of Motorway No 7 (Pattaya-Map Ta Phut) on May 22 and allow motorists to use the section for free until the end of August, director-general Sarawut Songsiwilai said on Sunday.

“Motorway No 7 connects Bangkok to Banchang district in Rayong and is part of the department’s 20-year strategic plan to develop the interprovincial motorway network,” he said. “It currently ends at Pattaya. The extended section will now run from Pattaya to Map Ta Phut in Rayong.”

Sarawut explained that the 32-kilometre extended section comprises three toll booths – at Huai Yai, Khao She On and Map Ta Phut districts.“

The cost of the project was Bt17.78 billion, comprising Bt6 billion for land expropriation and Bt11.78 billion for construction. The extended section was 100 per cent financed by profit from toll fee collections on Highway 7 and Highway 9,” he said.“

From May 22, the public can use the section for free starting at the U-Tapao toll booth. After August 31, the toll fee for Motorway No 7 will be Bt25-130 for four-wheel vehicles, Bt45-210 for six-wheel vehicles and Bt60-305 for other vehicles.”

“The Bangkok-Banchang Motorway No 7 is an important route that completes the transportation network in the Eastern Economic Corridor and will connect existing and future marine and air transportation routes,” he added. “It will also promote inter-border trade with neighbouring countries, reduce traffic congestion on main highways and drive the local economy.”

The reality is that it doesn't really help Central Pattaya people as the only entrances are at Highway 7 or near the Ambassador.  But in future it should take a lot of the traffic going directly to Rayong, Sattahip, Ban Chang etc, which will alleviate congestion on Sukhumvit especially in the weekends.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • COVID-19

    Any posts or topics which the moderation team deems to be rumours/speculatiom, conspiracy theory, scaremongering, deliberately misleading or has been posted to deliberately distort information will be removed - as will BMs repeatedly doing so. Existing rules also apply.

  • Advertise on Pattaya Addicts
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.